Brianna Petz

Partner / Creative Director Brianna uses her extensive brand development experience to bring an unparalleled level of detail and creativity to every project. She will collaborate to find the best solution and approaches every project as an opportunity to take the brand to the next level.

Toronto, June 13th, 2023 – Canadian Copper Inc. (CSE:CCI) (“Canadian Copper” or the “Company”) is pleased to announce that, pursuant to the terms of a Letter of Intent (“LOI”) it entered into with Votorantim Metals Canada Inc., an arm’s length seller (“VM Canada” or the “Seller”), it intends to acquire VM Canada’s entire 72% interest […]

Canadian Copper to Acquire Large 18 Million Tonne VMS Deposit Read More »

Toronto, February 28th, 2023 – Canadian Copper Inc. (“Canadian Copper” or the “Company”) (CSE:CCI) is pleased to report results from its November and December 2022 trenching program at the Chester Project (“Chester”) located in the well-known Bathurst Mining Camp (“BMC”) in Northern New Brunswick, Canada. “This initial +4000 meter (“m”) trenching program was designed to

Canadian Copper Identifies New Mineralized Areas at the Chester Project Read More »

Toronto, December 20th, 2022 – Canadian Copper Inc. (CSE:CCI) (“Canadian Copper” or the “Company”) is pleased to announce that is has closed its previously announced private placement consisting of 4,080,000 flow-through shares (the “FT Shares“) at a price of C$0.10 per FT Share for aggregate gross proceeds of $408,000 (the “FT Offering”). There were no

Canadian Copper Announces Closing of Oversubscribed Private Placement Read More »

Toronto, December 12th, 2022 – Canadian Copper Inc. (“Canadian Copper” or the “Company”) (CSE:CCI) is pleased to announce it has completed its property-wide 2022 trenching program at the Chester Project (“Chester”) located in the prolific Bathurst Mining Camp (“BMC”) in Northern New Brunswick. “All personnel and trenching equipment have been safely demobilized from the Chester

Canadian Copper Provides Exploration Update at Chester Project Read More »

Toronto, December 5th, 2022 – Canadian Copper Inc. (CSE:CCI) (“Canadian Copper” or the “Company”) announces that it has initiated a non-brokered, flow-through share offering (the “FT Offering”) of up to 3,000,000 flow-through shares (the “FT Shares“) of the Company at a price of C$0.10 per FT Share with each FT Share consisting of one common

Canadian Copper Announces a Non-Brokered Flow-Through Offering Read More »

Toronto, November 14th, 2022 – Canadian Copper Inc. (“Canadian Copper” or the “Company”) (CSE:CCI) is pleased to provide an update on its property-wide 2022 trenching program at the Chester Project (“Chester”) located in the well-known Bathurst Mining Camp (“BMC”) in Northern New Brunswick. Provincial funding for the Chester Project was also applied for and successfully

Canadian Copper Provides Chester Regional Prospecting Update Read More »

Indicated Resource Increases by 3x, Maintains Inferred Resource Size Toronto, November 1st, 2022 – Canadian Copper Inc. (“Canadian Copper” or the “Company”) (CSE:CCI) is pleased to announce a new Mineral Resource Estimate (“MRE” or “Mineral Resources”) for the Chester Copper Project (“Chester”) located in New Brunswick, Canada. The MRE was prepared by APEX Geoscience Ltd.

Canadian Copper Significantly Grows Mineral Resources at Chester Project Read More »

https://www.youtube.com/watch?v=4zw2ZsNLorg&feature=youtu.be Canadian Copper CEO Simon Quick joined Steve Darling from Proactive to share more drill results from 13 holes at the Chester Copper Project in New Brunswick. Quick telling Proactive the company was looking at targets, the Central, West and East Zones and was able to validate historical resource and the geologic model for those

Canadian Copper releases more positive drill results from Chester Copper Project Read More »

Toronto, September 12th, 2022 – Canadian Copper Inc. (“Canadian Copper” or the “Company”) (CSE:CCI) is pleased to announce positive exploration results from its next thirteen holes at Chester Copper Project (“Chester”) located in the Bathurst Mining Camp, New Brunswick, Canada. “We are pleased with the results of Phase Two drilling at the Chester Central and

Canadian Copper Reports Near-Surface Intercept of 1.44% Cu over 11.25 meters at the Chester Copper Project, Bathurst Camp, New Brunswick Read More »

Sign up for our Investor Mailing List